Well this is going to be more of a miserable grumble than an insightful bit of writing. A few weeks ago I wrote that the road outside our apartment was being dug up to replace the gas main (expected work timescale, 7 weeks). This was just a few weeks after they’d dug up the near side to repair a burst water main. Well this past week I’ve been suffering from tonsillitis from hell and it’s been truly uncomfortable. Just to make sure I didn’t suffer silently, the utilities guys only came back to dig up half the huge gas main hole they dug the other week. What the problem was I don’t know but the secondary work’s taken a full week to complete. You can see a shot of the re-repaired section above with the earlier re-laid section to the left and the nearside repairs under the white lines. So we’ve had road works banging away for at least 8 of the last 12 weeks. Then today we spotted some new signs up along Sandy Lane confirming that road works to replace the damaged road surface would commence 1 March, with most work being done at night to limit disturbance. To whom? It’s not much of a consolation if your bedroom overlooks the bloody works. Sigh….is it just me or does this incessant series of road works seem deliberately scheduled for maximum annoyance, especially to me? Wasn’t there some Gov’t initiative to prevent this and fine errant utility companies for mis-scheduling the works? It sounds a bit New Labour. I’d better be careful what I wish for – was urban living really better with John Prescott in charge? Er no.
pp